0 Items

Timing made in China replacement parts Belt

Timing made in China replacement parts Belt

FURTHERMORE, WE CAN PRODUCE C EPTOMIZED VARIATEPT, EPTARED MOTEPT, ELECTRIC MOTEPT AND OTHER HYDRAULIC PRODUCTS ACCORDING TO C EPTOMERS’ DRAWINGS. EPT#270L100G Specifications

  • EPT #: EPG-LG9169588
  • Mfr #:270L100G
Industry Number – Timing Belts: 270L100 Gearbelt Series – Timing Belts: L
Item – Timing Belts: Industrial Timing Belt Teeth Location – Timing Belts: Single Sided
Pitch Length – Timing Belts: 27 in Item: Industrial Timing Belt
Material: Neoprene Temp. Range: -22 Degrees to 194 Degrees F
Cord Material: Fiberglass Width – Timing Belts: 1 in
Pitch – Timing Belts: 3/8 in Number of Teeth – Timing Belts: 72
Country of Origin (subject to change): Japan

Help us improve our product information

Description

Industrial Timing Belt, Gearbelt Series – Timing Belts L, Industry Number – Timing Belts 270L100, Width – Timing Belts 1 In., Number of Teeth – Timing Belts 72, Pitch – Timing Belts 3/8 In., Pitch Length – Timing Belts 27 In., Teeth Location – Timing Belts Single Sided, Material Neoprene, Temp. Range -22 Degrees to 194 Degrees F

Timing made in China replacement parts Belt

Timing made in China replacement parts Belt

Timing made in China replacement parts Belt

Timing made in China replacement parts Belt

Contact us for More information →//m.0x80040116.com/contact-us/

You are always welcome to ask any information! Please feel free to contact us!

Product categories

MATERIALS AVAILABLE

1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6.铝:Al6061,艾尔6063
7.OEM according to your request

SURFACE TREATMENT

Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.

PROCESSING METHOD

CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly

QC & CERTIFICATE

Technicians self-check in production,final-check before package by professional Quality inspector

ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009

PACKAGE & LEAD TIME

Size: Drawings

Wooden Case/Container and pallet, or as per customized specifications.

15-25days samples. 30-45days offcial order

Related Searches:

Pin It on Pinterest

Share This