0 Items

Engine made in China replacement parts Timing Chain Kit Front 9 4148SHD

Engine made in China replacement parts Timing Chain Kit Front 9 4148SHD

ensures the stability and consistency of the key function of components. EPT#9-4148SHD Specifications

  • EPT #: EPG-LG5604269
  • Mfr #:9-4148SHD
Country of Origin (subject to change): Jamaica

Help us improve our product information

Description

EPTAftermarket Division offers an extensive line of replacement timing drive systems and components through the aftermarket distribution network. We have established this position through offering the highest quality products and delivering superior customer service. EPThas been manufacturing and marketing timing components for over 90 years.

Restrictions and Compliance

This item has been restricted from sale in the following states:
AK, GU, HI, PR, VI

Engine made in China replacement parts Timing Chain Kit Front 9 4148SHD

Engine made in China replacement parts Timing Chain Kit Front 9 4148SHD

Engine made in China replacement parts Timing Chain Kit Front 9 4148SHD

Engine made in China replacement parts Timing Chain Kit Front 9 4148SHD

Contact us for More information →//m.0x80040116.com/contact-us/

You are always welcome to ask any information! Please feel free to contact us!

MATERIALS AVAILABLE

1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6. Aluminum: Al6061, Al6063
7.OEM according to your request

SURFACE TREATMENT

Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.

PROCESSING METHOD

CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly

QC & CERTIFICATE

Technicians self-check in production,final-check before package by professional Quality inspector

ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009

PACKAGE & LEAD TIME

Size: Drawings

Wooden Case/Container and pallet, or as per customized specifications.

15-25days samples. 30-45days offcial order

Related Searches:

Pin It on Pinterest

Share This